Daios Doosan Solar 225LC-V Excavator Set of PDF Manuals

$50
  • Brand: Daewoo Doosan
  • Availability: Instant Download or CD via AirMail
  • File Size: 78.8 Mb
  • File Format: PDF
  • Language: English
  • Requirements: Adobe PDF Reader
  • Compatible OS: All Windows, Mac OS, iOS, Android, Linux
  • Publication date: 2002 year

Description of Daios Doosan Solar 225LC-V Excavator Set of PDF Manuals

This set includes detailed Operation And Maintenance Manual, Shop Manual for Daios Doosan Excavator Solar 225LC-V.
Manuals include detailed repair and technical service information, special instructions for repair and maintenance and other additional troubleshoot information for Daios Doosan Solar Excavator.
These manuals come in PDF format. For high-quality work with a PDF manual, we recommend that you install the application Adobe PDF Reader.
Manuals allow you to identify and resolve problems and inaccuracies.

Set covers:
- Operation And Maintenance Manual 022-00032E
- Shop Manual 023-00058E

S/N:
1001 and Up

Models:
Solar 225LC-V

Contents (Operation and Maintenance Manual)s:
Safety
To the Operator of a Daewoo Excavator
Location of Safety Labels
Summary of Safety Precautions for Lifting in Digging Mode
Unauthorized Modifications
General Hazard Information
Before Starting Engine
Machine Operation
Maintenance
Battery
Towing
Shipping and Transportation
Excavator Rated Lift Capacity Tables
Operating Controls
Component Locations
Operator’s Area
Operational Controls and Panels
Instrument Panel
Multifunction Gauge and Graphic Information
Mode Selection Buttons
Setting Method for Main Menu
Heater and Air Conditioner Control Panel
Stereo
Fuse Boxes
Miscellaneous Electrical Devices
Seat Adjustment
Seat Belt
Ceiling Cover
Front Windows
Door Side Latch
Miscellaneous Access Covers and Doors
Cab Storage Compartments
Ashtray
Emergency Glass Breaking Tool
Operation
To Handle a New Excavator
Starting and Stopping the Engine
Safety Lever
Travel
Operating Instructions
Operating Precautions
Parking Excavator
Towing Procedure
Hydraulic Breaker
Operating Techniques
Operation Under Unusual Conditions
Inspection, Maintenance And Adjustment
Preliminary Work Machine Setup for Maintenance
Table of Recommended Lubricants
Fluid Capacities
Lubrication and Service Chart
Maintenance Intervals
10 Hour / Daily Service
50 Hour / Weekly Service
250 Hour / Monthly Service
500 Hour / 3 Month Service
1000 Hour / 6 Month Service
2000 Hour / Yearly Service
4000 Hour / Biennial Service
12,000 Hour / Six Year Service
Venting and Priming Hydraulic System
Handling of Accumulator
Fuel Transfer Pump (Option)
Electrical System
Air Conditioning System
Bucket
Bucket Shimming Procedures
Track Tension
Bolt and Nut Inspection
Maintenance in Special Conditions
Long Term Storage
Transportation
Loading and Unloading
Lifting With Sling
Troubleshooting
Engine
Hydraulic System
Swing System
Travel System
Electrical System
Specification
Standard Specification
Overall Dimensions
Working Range
Approximate Weight of Workload Materials
Index

Contents (Shop Manual):
Safety
Track Excavator Safety
Specifications
Specifications for Solar 225LC-V
General Maintenance
General Maintenance Procedures
Standard Torques
Upper Structure
Cab
Counterweight
Fuel Tank
Fuel Transfer Pump
Swing Bearing
Swing Reduction Gearbox
Lower Structure And Chassis
Track Assembly
Engine And Drive Train
Air-Conditioner
Drive Coupling (Main Pump)
Hydraulics
Hydraulic System Troubleshooting, Testing and Adjustment
Accumulator
Center Joint (Swivel)
Cylinders
Swing Motor
Travel Motor (With Gearbox) (GM35VL)
Main Pump (With Regulator)
Main Control Valve (Kayaba)
Pilot Control Valve (Work Lever / Joystick)
Travel Control Valve (With Damper)
Hydraulic Schematic (Solar 225LC-V/225NLC-V)
Electrical System
Electrical System
Electrical Schematic (Solar 225LC-V/225NLC-V)
Attachments
Boom and Arm
Bucket

Reviews (0)

Write a review

Note: HTML is not translated!
    Bad           Good